Sign In | Join Free | My ledscreensign.com
China Henan Dowell Crane Co., Ltd. logo
Henan Dowell Crane Co., Ltd.
To Seek the speed, chase the efficiency, guarantee the quality!
Active Member

7 Years

Home > Gantry Crane >

10 Ton Single Girder Gantry Crane 5-15m/Min Lifting Speed For Industrial Factory

Henan Dowell Crane Co., Ltd.
Contact Now

10 Ton Single Girder Gantry Crane 5-15m/Min Lifting Speed For Industrial Factory

Brand Name : Dowellcrane

Model Number : MH Gantry Crane

Certification : ISO CE BV CCC GOST SGS

Place of Origin : China (Mainland)

MOQ : 1 Set

Payment Terms : L/C, T/T

Supply Ability : 10000 Sets per Year

Delivery Time : 25days

Packaging Details : Main body packaged by high quality water-proof plastic woven cloths; spare parts are packed in high quality plywood box.

cantilever length : 0-15m

Lifting speed : 5-15M/MIN

Trolley running speed : 20-40M/MIN

Crane running speed : 30-50M/MIN

Control method : cabin control/wire rope remote control

Protection grade : IP54

Contact Now

10 ton Single Girder Chinese Gantry Crane for Industrial Factory

Product Description

10 ton Single Girder Chinese Gantry Crane is a regular crane widely used at open ground and warehouses to load or grab materials. There are two kinds of operation: ground or air operation. The crane power supply can be through cable car and cable drum reel, and customers can choose one of them.

Regular Maintenance

The working performance and service life of each mechanism of lubricating bridge erecting machine depend on lubrication to a great extent. When lubricated, the maintenance of mechanical and electrical products, lubrication refer to their own manual, walking cart, heavy truss truck should be a weekly note of grease. Attention should be paid to wire breakage of the wire rope. If there is broken wire, broken stock or wear to reach the scrapping standard, should be replaced in time. Spreader spreader must be inspected periodically. The pulley block of bridge erecting machine mainly checks the wear condition of rope groove, whether the wheel rim is cracked and whether the pulley is stuck on the shaft. Check the rim and tread of the wheel regularly, and replace the wheel when the rim is worn or cracked to 10% thickness. Bridge erection machine brake should be checked once per shift. The brake should move accurately and the pin shaft is not allowed to jam. The brake shoe shall be properly fitted to the brake wheel and the shoe clearance shall be equal when the brake is released.

  • from the quality of the product workmanship to consider, a good bridge erecting machine not only appearance meguiar's, and every part is to keep improving. The processing process is complex, many processes are used for finishing.
  • also look at the service of manufacturer, large-scale manufacturers, will generally provide installation and after-sale services, training, etc. A set of, settled and small manufacturers may not do so complete, when there is a problem in use process, lead to cannot continue operation, slow speed of maintenance, greatly delay the construction period, this is all need to consider, some engineering can't delay, delay the whole project, the cost may be.
  • still have is the price also is the factor that we need to consider when buying bridge erecting machine, but what need to remind a buyer is, cannot consider the height of the price only, should look according to its configuration price is appropriate.

Announcements

  • The construction personnel must hold the relevant qualification certificate, understand the relevant management system and the relevant safety work regulations.
  • When the gantry crane is dismantled, it shall be dismantled in strict accordance with the work steps of the instruction. If the staff finds that there is a change in the dismantling process, they shall report to the chief engineer for approval before proceeding.
  • The tools used to disassemble and install gantry cranes need to be carefully inspected. The power tools of the staff must meet the relevant product quality standards.
  • Workers in the workshop must wear overalls during working hours, and cannot wear shoes with plastic bottom or poor skid resistance.
  • When working at height, all the equipment used should be tied with a fall rope and a safety belt.
  • In the process of dismantling, the staff must pay attention to prevent scratching, trampling and so on.
  • The crane binding work must find a person to be responsible for the inspection, can not be ignored, to ensure that the foolproof.
  • When the gantry crane is about to be hoisted, non-working personnel must be cleared around the cargo to prevent unnecessary personal injury.
  • The hoisting wire rope must meet the requirements of not exceeding the standard such as broken wire and wear.
  • After the main girder is lifted, all employees must stick to their posts and not leave without permission.

Parts Of Crane

10 Ton Single Girder Gantry Crane 5-15m/Min Lifting Speed For Industrial Factory


Product Tags:

gantry lifting equipment

      

goliath crane

      
Quality 10 Ton Single Girder Gantry Crane 5-15m/Min Lifting Speed For Industrial Factory for sale

10 Ton Single Girder Gantry Crane 5-15m/Min Lifting Speed For Industrial Factory Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Dowell Crane Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)